    Calculates locally in your browser · Meyerhof pile capacity
    Geotechnical / deep foundations

    Pile capacity

    A pile carries load two ways: at the tip, where the soil fails in bearing, and along the shaft, where it fails in friction. The two are computed separately and added, and in sand the tip term depends on the length-to-diameter ratio — which is why a longer pile in sand is disproportionately stronger, and why a pile in clay behaves quite differently.

    SoilSandTip pressure8000 kPaTip share57%
    Allowable capacity
    704 kN
    ultimate 1759 kN over FS 2.5
    Tip capacity
    1005 kN
    57% of the total
    Shaft capacity
    754 kN
    40.0 kPa unit friction
    Slenderness L/D
    37.5
    drives the tip term in sand
    Tip plus shaft
    The two mechanisms are computed separately and added; the factor of safety applies to the sum.
    704 kN
    Tip plus shaft
    QuantityValueBasis
    Diameter400 mmas entered
    Embedded length15.0 mas entered
    L/D37.5slenderness
    Cross-section0.1257 m²πD²/4
    Perimeter1.257 mπD
    End-bearing pressure qp8000 kPaMeyerhof, capped at 4 pa N60
    Unit shaft friction fs40.0 kPa2 N60, capped at 100
    Tip capacity1005 kNqp × Ap
    Shaft capacity754 kNfs × perimeter × L
    Ultimate1759 kNtip + shaft
    Allowable704 kN÷ 2.5

    In sand the tip term is capped at 4 pa N60, so lengthening the pile stops helping once L/D passes about 10 — at this slenderness of 37.5 the cap is governing.

    Inspect the model
    Choose a quick result view, a scaled comparison, or the complete diagnostic set.
    Capacity against pile length
    In sand the tip term saturates at L/D of about 10, so beyond that only the shaft grows — and it grows linearly.
    Capacity against pile length0.000562.971125.951688.922251.892814.875 m5 m10 m10 m15 m15 m20 m20 m25 m25 m30 m30 mUltimate, kN
    Tip against shaft
    A short pile is tip-dominated; a long one is shaft-dominated.
    Tip against shaft0.000237.25474.51711.76949.011186.27TipTip753.98ShaftShaftkN
    Canonical equations
    The exact relationships implemented by this engine.

    qp = 0.4 pa N60 (L/D) ≤ 4 pa N60 · Meyerhof.

    fs = 2 N60 ≤ 100 kPa · Driven pile.

    qp = 9 cu · Undrained.

    (Qp + Qs) / FS · FS 2.5 to 3.

    engineering methodology

    A clear path from inputs to results.

    A pile carries load two ways: at the tip, where the soil fails in bearing, and along the shaft, where it fails in friction. The two are computed separately and added, and in sand the tip term depends on the length-to-diameter ratio.

    Step-by-step methodWorked exampleAssumptions explained

    How to use

    1. Choose the soil type and the installation method.
    2. Enter the diameter and embedded length.
    3. Set the SPT blow count for sand or the undrained strength for clay.
    4. Read the tip and shaft capacity and the allowable load.

    The formula

    Qult=qpAp+fsπDLQ_{ult} = q_p A_p + f_s \pi D L

    Reference: Meyerhof (1976) as summarised in FHWA deep-foundation design guidance.

    Worked example

    A 400 mm driven pile, 15 m into sand

    Inputs
    • 400 mm diameter, 15 m embedded.
    • N60 = 20, driven.
    • Factor of safety 2.5.
    Calculation path
    1. 1

      The slenderness is 15/0.4 = 37.5.

    2. 2

      The tip pressure is 0.4 × 100 × 20 × 37.5 = 30,000 kPa, capped at 4 × 100 × 20 = 8,000 kPa.

    3. 3

      Tip capacity is 8,000 × 0.1257 = 1,005 kN.

    4. 4

      Unit shaft friction is 2 × 20 = 40 kPa, so the shaft carries 40 × 1.257 × 15 = 754 kN.

    5. 5

      The ultimate capacity is 1,759 kN and the allowable is 704 kN.

    Result

    8,000 kPa tip · 1,759 kN ultimate · 704 kN allowable.

    Interpreting the result

    The cap at 4 pa N60 is what stops a long pile in sand from developing an implausible tip resistance. Because it binds at an L/D of about 10, extra length in sand buys shaft friction only — which is linear, and much less than the tip would have been.

    Assumptions & limitations

    • A single pile in uniform soil with no group effect.
    • Driven piles; bored piles take two-thirds of the shaft friction in sand.
    • No settlement, downdrag, scour or uplift.
    • The factor of safety is applied to the ultimate capacity.

    Frequently asked questions

    Why is the tip pressure capped?

    Because a pile in sand cannot mobilise more than about 4 pa N60 at the base, however long it is. Beyond that the soil fails locally rather than in a general bearing failure.

    What factor of safety should I use?

    2.5 to 3 for a single pile without a load test, and 2.0 if a static load test confirms the capacity.

    Does a pile group carry more than the sum?

    Usually less per pile, because the zones of influence overlap. A group efficiency factor or a block failure check is needed.

    Why does clay behave differently?

    Because undrained clay has no friction angle: the tip is 9 cu and the shaft is α cu, both linear in strength and length. There is no slenderness benefit.

    Can I add the tip and shaft directly?

    Meyerhof does, but they mobilise at different settlements — the shaft peaks early and the tip later. For a settlement-limited design the sum overstates the capacity at working load.

    Methodology last reviewed 2026-10-22. Results are informational and not financial or engineering advice — see our disclaimer.