    Concrete / Prestress

    Prestressed Concrete Stresses

    The top and bottom fibre stresses of a prestressed beam at transfer and at service. Prestress puts the section into compression so the concrete never goes into tension under load — and the two stages have different limits.

    Bottom at transfer-20.1 MPaBottom at service16.6 MPaTop at service-47.6 MPa
    Bottom at transfer
    -20.1 MPa
    Compression
    Bottom at service
    16.6 MPa
    Tension
    Top at service
    -47.6 MPa
    Usually the critical fibre
    Effective prestress
    3280 kN
    after 18% losses
    Fibre stresses
    f = −P/A ± P·e/Z ± M/Z. Compression is negative.
    Fibre stresses
    FibreTransferService
    Top1.2 MPa-47.6 MPa
    Bottom-20.1 MPa16.6 MPa
    Inspect the model
    Choose a quick result view, a scaled comparison, or the complete diagnostic set.
    Bottom stress against service moment
    The whole point of the prestress is that this line stays below zero.
    Bottom stress against service moment-24.07-8.347.4023.1338.8754.600010001000200020003000300040004000Prestressed Concrete Stresses
    Canonical equations
    The exact relationships implemented by this engine.

    f = −P/A ± P·e/Z ± M/Z · Compression negative.

    Pe = Pi(1 − losses) · After all losses.

    engineering methodology

    A clear path from inputs to results.

    The top and bottom fibre stresses of a prestressed beam at transfer and at service. Prestress puts the section into compression so the concrete never goes into tension under load — and the two stages have different limits.

    Step-by-step methodWorked exampleAssumptions explained

    How to use

    1. Set area a (mm²).
    2. Set section modulus zb (×10⁶ mm³).
    3. Set section modulus zt (×10⁶ mm³).
    4. Set eccentricity e (mm).
    5. Read the headline metrics, then check the table for the detail.

    The formula

    f=−P/A±P⋅e/Z±M/Zf = −P/A ± P·e/Z ± M/Z

    Reference: Elastic fibre stresses with effective prestress.

    Worked example

    At the default inputs

    Inputs
    • Area A (mm²): 300000; Section modulus Zb (×10⁶ mm³): 60; Section modulus Zt (×10⁶ mm³): 45; Eccentricity e (mm): 350; Initial prestress Pi (kN): 4000; Losses (%): 18; Self weight moment (kN·m): 600; Service moment (kN·m): 2200
    Calculation path
    1. 1

      Bottom at transfer: -20.1 MPa · Bottom at service: 16.6 MPa · Top at service: -47.6 MPa · Effective prestress: 3280 kN

    Result

    Bottom at transfer: -20.1 MPa · Bottom at service: 16.6 MPa · Top at service: -47.6 MPa

    Interpreting the result

    At service the bottom fibre is at 16.6 MPa.

    Assumptions & limitations

    • Elastic uncracked section.
    • Losses taken as a single percentage.

    Frequently asked questions

    Why check at transfer?

    The concrete is youngest and the prestress is highest, so the opposite fibre can crack.

    What are typical losses?

    15–20% for pretensioned members; higher for post-tensioned with long tendons.

    Methodology last reviewed 2026-10-22. Results are informational and not financial or engineering advice — see our disclaimer.