Treasury futures hedge calculator
A bond portfolio can be hedged by shorting Treasury futures in the ratio of their dollar durations. This calculator computes the number of contracts, the residual exposure left by rounding, and the P&L the position produces for a given rate shift.
| Term | Value |
|---|---|
| Portfolio value | $10,000,000 |
| Portfolio duration | 6.00 |
| Portfolio dollar duration | $60,000,000 |
| Futures price | $110.00 |
| Futures duration | 6.50 |
| Conversion factor | 1.000 |
| Contracts | 83.92 |
Short the futures to hedge a long bond portfolio; buy them to hedge a short position.
N = (V·D_p) / (P·1000·D_f / CF) · Dollar duration matching.
V × modified duration · Approximate P&L per 1% rate move.
|N − round(N)| × contract DD · The cost of integer contracts.
A clear path from inputs to results.
A bond portfolio can be hedged by shorting Treasury futures in the ratio of their dollar durations. This calculator computes the number of contracts, the residual exposure left by rounding, and the P&L the position produces for a given rate shift.
How to use
- Enter the portfolio value and its modified duration.
- Enter the futures price, its duration and the conversion factor.
- Read the contract count and residual exposure.
- Check the P&L for a rate shift.
The formula
Reference: Duration-based hedge ratio for Treasury futures; conversion factor adjusts for the cheapest-to-deliver.
Worked example
$10M portfolio at duration 6, futures at 110
- Portfolio $10,000,000, duration 6.
- Futures price 110, duration 6.5, conversion factor 1.0.
- 1
Portfolio dollar duration: 10M × 6 = $60M.
- 2
Contract dollar duration: 110 × 1000 × 6.5 = $715,000.
- 3
Contracts: 60M / 715,000 = 83.9.
- 4
Rounding to 84 leaves about $71,500 of residual exposure.
83.9 contracts · $715k per contract · small rounding residual.
Interpreting the result
The ratio equalises dollar duration, so a one-basis-point move costs the same on both sides. What it cannot remove is basis risk: the portfolio and the cheapest-to-deliver are different bonds, and their spread moves independently of the curve.
Assumptions & limitations
- Parallel shifts in the yield curve.
- Stable spread between the portfolio and the CTD.
- No margin, financing or roll costs.
- Contract size of 1,000 per point.
Frequently asked questions
Why the conversion factor?
Futures are priced off a notional bond; the factor converts the CTD price to that notional.
Should I round up or down?
Either; rounding leaves a small residual exposure in one direction.
What is basis risk?
The residual mismatch between the hedged portfolio and the futures contract.
Methodology last reviewed 2026-10-21. Results are informational and not financial or engineering advice — see our disclaimer.